| Figure | Programme, as reported |
|---|---|
| 2 points | Grocery Outlet's SAP launch cut gross margin by almost 2 points.Law360 reported that Judge Jon S. Tigar of the Northern District of California dismissed the proposed investor class action on 16 September. |
| £1.22bn | Asda's tech divorce from Walmart, including a new SAP system, cost £1.22bn.Project Future separated the UK's third largest supermarket from Walmart's systems after the 2021 sale. |
| €200m | Zeiss stopped a €200m SAP build after six years.Bloomberg reported on 7 September that the Oberkochen optics group, a key supplier to the chip industry, has overhauled its move to SAP's cloud after costs passed €200 million. |
Method
- What gets an entry
- A programme that a named outlet or a court filing reports as stopped, overrun or in dispute, with a public figure. Each entry is decided case by case.
- What the figure is
- The number as the source gave it. The figures here are of different kinds (a programme cost, a separation cost, a margin effect) and are not comparable. A programme cost covers the whole programme, not one vendor's software.
- Take the table
- Download the file (CSV) · Every figure in the archive
Know of one we have missed, with a public source? Send it.
Get issue 01: the Zeiss case, for a steering committee
Each issue takes one programme and lays out what was reported, what the reports cannot tell you, and what a steering committee can ask each quarter. Issue 01 is on the site. Read issue 01